Designed mid-drag
The lifted card, the ghost gap it left behind and the dashed drop target are all drawn. Static board designs hand the hardest part of the build — what the screen does while you are moving something — to whoever writes the code.
The WIP limit sits on the column
In progress reads 3 with a 3 of 3 badge beside it. A limit written into the column header is a limit people follow; one buried in project settings is a number nobody sees.
Cards that carry enough to triage
Label, title, issue key, comments, checklist progress and assignee. PIN-241 shows 0 of 3 and PIN-227 shows 2 of 2, which is enough to sort a sprint without opening a single issue.
The sprint says how long is left
"Sprint 42 — 4 to 15 August, 5 days left" sits above the columns with the active filter shown as a removable chip, so what you are looking at and how it was narrowed are both on screen.